PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Excavation for Footing L-5 Northeast of the Site.JPG Rebar Mat for Shear Walls at Elevator 5 - 6.JPG Footing G.1 - 1 and Radius Formwork covered with blankets.JPG Elevator 5 - 6 with Shear Wall Formwork awaiting Erection.JPG Elevator 4 Stairtower 2 Shear Wall prep work.JPG Rebar mats for elevator shear walls.JPG Random Site pic.JPG Formwork for Footing L-5 and M-6.JPG
Previous pageNext page Elevator 5 - 6 with Shear Wall Formwork awaiting Erection
Elevator 5 - 6 with Shear Wall Formwork awaiting Erection